sales@bujavi.com· Mon–Sat 09:00–18:00 (GMT+8)· WhatsApp +86 176 7177 6620
Request a Quote
Menu

Auxiliary equipment

Industrial chillers for PU equipment

Specify process-water cooling or combined heating and cooling to match your foaming machine and temperature-control circuit.

Temperature-control unit beside PU foaming equipment in a manufacturing workshop

What to specify

RequirementWhat to send
Operating modeCooling only, or both heating and cooling.
Process water temperaturesRequired supply temperature, expected return temperature and normal operating range.
Water circuitRequired flow, equipment to be connected and connection sizes.
Heat loadEstimated load, or machine details and operating schedule for review.
InstallationElectrical supply, location, ambient temperature and available space.

Reference equipment views

Sizing the temperature-control unit

Can the unit also heat the process water?

Combined heating and cooling units are available. Share the temperature required in each operating mode so the manufacturing partner can check the configuration.

Can I replace a unit on an existing machine?

Send the machine and existing unit nameplates, photos of the water connections and the normal operating temperature. Include any known flow, cooling duty and electrical details.

Explore project examples

Browse documented equipment projects for production examples. Configurations differ; ask about equipment relevant to your process.

Agree the equipment and service scope

  • Equipment and options — Confirm the main equipment, moulds, carriers, heating, cooling and automation included in the quotation; options depend on your process.
  • Factory utilities — Share the installation country, electrical supply, compressed air, cooling and available floor space for review.
  • Material trial and acceptance — If a material trial is planned, agree material supply, test conditions, shot targets and inspection records before the order.
  • Installation and support — Agree installation, commissioning, training and spare-parts scope in the quotation. Online technical guidance and training videos are available.

Send your process-water requirements

Include the equipment served, target temperature, flow and installation country. For a replacement, attach the existing unit nameplate.

WhatsApp