Resources
PU equipment selection and quotation checklists
Prepare the information needed to compare machines, plan a line or assess an upgrade.
Machine quotation checklist
- Part and mould. List part dimensions, mould dimensions, cavity count and the smallest and largest shot weights.
- Material system. Identify the foam type, number of components and any fillers. Share viscosity and mix ratio if available.
- Production and utilities. Give the required units per hour or shift, power supply, compressed air and available space.
- Delivery. Include the country, port and any documentation your importer requires.
Production line layout checklist
- Cycle and stations. Share fill, cure and demould times, units per shift and the moulds that will run together.
- Heating and handling. Specify mould temperature needs and the steps you want to automate, such as release spraying or demoulding.
- Floor plan. Mark floor dimensions, access doors, columns, utility points and operator access.
Compare the available PU production line formats.
Retrofit assessment checklist
- Current equipment. Send the nameplate, layout, cabinet and mixing-head photos. Include drawings or manuals when available.
- Current performance. Record the symptom, affected materials or recipes, and any measurements or alarms.
- Required result. Define the target performance, available downtime and the checks you would use to accept the work.
See the retrofit review process.
Request a specification sheet for your configuration
Include the equipment family, application, required output and site utilities.